Visita pozo soton. Localización (21 Photos)


Throughout the 20th century, Pozo Sotón was subject to various extensions and modifications to increase its production capacity and efficiency, although always respecting the original concept. The latter houses the Siemens Pulley Koepe extraction machines, which replaced the original ones, as well as the compressors. The indicated configuration of the productive nucleus with the three elements — derricks, powerhouse, union offices and reter — allowed a fluid and concentrated organization of the work outside, reducing to the maximum the proliferation of minor constructions that could hinder the normal development of the center of processing and transport of coal. Links of interest. En este tiempo, han sido veinticinco mil personas las que han pasado por el Pozo, tanto en las dos modalidades de visita interior que ofrece como en las que se llevan a cabo en el exterior. After its liquidation in , its assets were sold to the Sociedad Hullera de Santa Ana, a french company linked to the Herreros. Since , the first mine in the world accessible on Google Street View. It has also supported interventions, evident in the whole structure.


Juventus plantilla

After its liquidation in , its assets were sold to the Sociedad Hullera de Santa Ana, a french company linked to the Herreros. Birth of Pozo Sotón Sotón Shaft The preparation and deepening of the Sotón Shaft was carried out between and , being necessary to displace the Nalón river. The declaration includes the following items: the two headframes.

Dragon barbudo

Throughout the 20th century, Pozo Sotón was subject to various extensions and modifications to increase its production capacity and efficiency, although always respecting the original concept. This involves the two headframes, as we have already said, integrating them into a single volume and partially breaking their mechanical and formal independence. The growth in length of the building responded to the need to replace the obsolete compressed air generation equipment that was still the original at the time. The central structure The central and fundamental piece of the well, is made up of the two metal headframes of rivets and welding, about 33 meters high.

Tomtom android full

This involves the two headframes, as we have already said, integrating them into a single volume and partially breaking their mechanical and formal independence. Originally there was no partial perimeter closure made of sheet metal that we can see today, which was installed to isolate the entire classification area from the weather. Links of interest. The declaration includes the following items: the two headframes.

Donde comen dos

Carrefour vinalopo. Visita corta

Switch to vertical operation A substantial change was consolidated in the second decade of the 20th century, when the transition from traditional coal exploitation, mountain mining, to vertical exploitation by deepening in vertical shafts, was initiated in the Coal Basins. Sotón is a unique adventure, the best plan when one wonders what to do in Asturias. Debes iniciar sesión para continuar. En este tiempo, han sido veinticinco mil personas las que han pasado por el Pozo, tanto en las dos modalidades de visita interior que ofrece como en las que se llevan a cabo en el exterior. The indicated configuration of the productive nucleus with the three elements — derricks, powerhouse, union offices and reter — allowed a fluid and concentrated organization of the work outside, reducing to the maximum the proliferation of minor constructions that could hinder the normal development of the center of processing and transport of coal. Originally there was no partial perimeter closure made of sheet metal that we can see today, which was installed to isolate the entire classification area from the weather. Links of interest. Its development in length was planned on the south side, so that from then on reter and headframes were off-centre with respect to the layout of the powerhouse.

Ager publicus

Estoy vivo capitulo 19

The extension of the building was planned with scrupulous respect for the identity of the property, maintaining the original style of the building. The indicated configuration of the productive nucleus with the three elements — derricks, powerhouse, union offices and reter — allowed a fluid and concentrated organization of the work outside, reducing to the maximum the proliferation of minor constructions that could hinder the normal development of the center of processing and transport of coal. In order to take profit and free up the spaces close to this mine, some of its old pieces pitheads were incorporated as auxiliary elements of the vertical shaft that is the case of Sallosa or Generala pitheads.

Fuente de alimentacion modular

The growth in length of the building responded to the need to replace the obsolete compressed air generation equipment that was still the original at the time. Iniciar sesión en Facebook Debes iniciar sesión para continuar. Throughout the 20th century, Pozo Sotón was subject to various extensions and modifications to increase its production capacity and efficiency, although always respecting the original concept. Links of interest.

Final gh duo 2019

De este modo sinonimo

Test auxiliar administrativo

Esta entrada fue postedel:01.11.2020 at 23:36.

Аuthor: Lil' A.

Un pensamiento en “Visita pozo soton

Deja una respuesta

Su dirección de correo electrónico no será publicada. Los campos obligatorios están marcados *